Most driving gets covered overnight on a Level 2 charger. The choice comes down to how many amps your panel can spare, whether it plugs in or gets hardwired, and whether you want the charger to manage its own load. Six chargers compared.
Set from 16 to 50 A in the app to match whatever circuit you have, with scheduling for off-peak charging.
Current
16–50 A, set in app
Install
Hardwire or 14-50 / 6-50 plug
Connector
J1772 (NACS version too)
Cable
23 ft
Listing
UL 2594 / 2231, ENERGY STAR
Warranty
3 years
Suits: Houses where the electrician will hardwire it, and drivers who want the charger to follow a time-of-use schedule.
Weigh: Full 50 A needs a hardwired 70 or 80 A breaker; plugged into a 14-50 it tops out at 40 A. Outdoors on a plug, ChargePoint recommends hardwiring because a GFCI breaker can trip against the charger's own protection.
A Level 2 charger needs a 240 V circuit sized at 125% of the charger's current, a permit and a final inspection; Tampa Electric's own charger page says the same. Before you buy, have an electrician check whether the panel has room. A load-managed charger is the usual answer when it doesn't.